Indonesia Power Transmission Development Fase II (IPTD-II)

Financing framework supporting resilient transmission infrastructure through sustainable implementation and international safeguard compliance.

Indonesia Power Transmission Development Fase II (IPTD-II)

PLN is embarking on an ambitious and comprehensive upgrade of the transmission infrastructure on grids in Java-Bali, Sulawesi and Kalimantan. The Government of Indonesia (GoI) has requested a loan from the World Bank for the IPTD 2 project, which involves a large number of subprojects to upgrade, expand or build new substations.


The development objective of IPTD2 is to assist the GoI to meet growing electricity demand and increase access to electricity in a sustainable manner. It will achieve this objective by strengthening and expanding the capacity of the power transmission networks in Java-Bali and other large islands in East and West Indonesia and improving PLN’s capacity to plan and operate the transmission and distribution network in an efficient and transparent way through introduction of smart grid technologies.


This is a follow-up operation of the on-going Indonesia Power Transmission Development Project (IPTD). The proposed project will continue the expansion of 150 kV sub-transmission systems in Java-Bali and Sumatra, which has been partly covered by the IPTD and support extension of the existing 150 kV sub-transmission systems in Kalimantan and Sulawesi to meet the increasing demand and to increase access rates in these islands.

Components

All three components of the IPTD2 involve infrastructure investment and require safeguards instruments as follow:

Component 1

Environmental Management Plan

Component 2

Land Acquisition and Resettlement Action Plan

Table IPTD2 Larap & EMP

Segala pertanyaan atau masukan dapat disampaikan ke website www.pln.co.id c.q DIVK3L atau telp. 021-7251122, 7261234 ext 4013.

Footer Background PLN

Connect With Us

Be part of our enthusiastic community that is interconnected in the vision of a sustainable future.

Alt : https://www.pln.co.id/webapi/media/file/webkorp/asset/pln-mobile-logo.png
Alt : https://www.pln.co.id/webapi/media/file/webkorp/asset/file100425_0348_ec74.png
Alt : https://www.pln.co.id/webapi/media/file/webkorp/asset/file100425_0348_6dd5.png
Alt : https://www.pln.co.id/webapi/media/file/webkorp/asset/file100425_0348_1f35.png

Our Office

PT PLN (Persero) Head Office Jalan Trunojoyo Blok M – I No 135 Kebayoran Baru, Jakarta 12160, IndonesiaTel: (+62) 21–7251234, 7261122 fax: (+62) 21–7221330